Reliability of TET Estel equipment

At the beginning of 2023, TET Estel AS shipped a power supply of TFC-800M-1.0 series with an SV-30 heat exchanger and a control panel for an induction furnace (capacity: 2 tons) for melting aluminum-manganese master alloys.

This power source replaced the previous TET Estel generator that has been in continuous operation since the 1980s. This replacement perfectly shows the reliability of the equipment made by ESTEL.

Watch the production video here.

Latest publications